Case studies

Evidence-led stories, not generic claims

Customer stories from construction and built environment organisations using Acumine® to improve visibility, reduce reporting effort and build stronger data foundations.

Showing case studies tagged Primavera P6Show all

Tilbury Douglas: unified S-Curve reporting across Asta and Primavera P6

Challenge: deliver consistent programme reporting across a portfolio spanning two scheduling tools, with S-Curves at project and work package level from a single dashboard.

Acumine® role: dual integration from Asta PowerProject and Oracle Primavera P6, normalised programme data model, and unified Power BI reporting with project and work package S-Curves.

Read case study
Case Studies | Acumine®